Solar transmittance through building fabric (gtot)
Solar heat gain in buildings can be beneficial in the winter, as it reduces the need for heating, but in the summer it can cause overheating.
The total solar heat transmittance into a space is the sum of the solar heat that is transmitted directly through its fabric (such as solar radiation transmitting through glass), and the solar heat that is absorbed by its fabric and then re-emitted into the enclosed space.
Total solar energy transmittance (gtot) relates to the performance of solar protection devices such as blinds and shutters and is the percentage of solar energy incident on the fabric of a blind or shutter that is transmitted to the interior of the building, including both the transmittance of the solar protection device itself and of the glazing.
According to the EN 14501 standard (Blinds and Shutters, Thermal and Visual Comfort, Performance Characteristics and Classification), it is measured on an index of 0 to 1. The closer the fabric’s index is to 0, the more efficient it is at protecting against heat and reducing solar energy; whereas an index of 1 means that all the incident solar radiation is transmitted.
Two methods are used for calculating the gtot of a solar protection device:
- Simplified calculation method: EN ISO 52022-1 (replacing EN 13363-1)
- Detailed calculation method: EN ISO 52022-3 (replacing EN 13363-2)
[edit] Find out more
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
How can digital twins boost profitability within construction?
A brief description of a smart construction dashboard, collecting as-built data, as a s site changes forming an accurate digital twin.
Unlocking surplus public defence land and more to speed up the delivery of housing.
The Planning and Infrastructure bill oulined
With reactions from IHBC and others on its potential impacts.
Farnborough College Unveils its Half-house for Sustainable Construction Training.
Spring Statement 2025 with reactions from industry
Confirming previously announced funding, and welfare changes amid adjusted growth forecast.
Scottish Government responds to Grenfell report
As fund for unsafe cladding assessments is launched.
CLC and BSR process map for HRB approvals
One of the initial outputs of their weekly BSR meetings.
Architects Academy at an insulation manufacturing facility
Programme of technical engagement for aspiring designers.
Building Safety Levy technical consultation response
Details of the planned levy now due in 2026.
Great British Energy install solar on school and NHS sites
200 schools and 200 NHS sites to get solar systems, as first project of the newly formed government initiative.
600 million for 60,000 more skilled construction workers
Announced by Treasury ahead of the Spring Statement.
The restoration of the novelist’s birthplace in Eastwood.
Life Critical Fire Safety External Wall System LCFS EWS
Breaking down what is meant by this now often used term.
PAC report on the Remediation of Dangerous Cladding
Recommendations on workforce, transparency, support, insurance, funding, fraud and mismanagement.
New towns, expanded settlements and housing delivery
Modular inquiry asks if new towns and expanded settlements are an effective means of delivering housing.
Building Engineering Business Survey Q1 2025
Survey shows growth remains flat as skill shortages and volatile pricing persist.